Terrapin Beer Co. logo

Rolec making progress on Terrapin’s 100-barrel brewhouse

Our friends at Rolec in Germany recently sent us the photos of the lauterton, mash kettle, and whirlpool- part of the new brewhouse they’re currently building for us!

It’s a 100-barrel brewhouse. The company has already installed four new 200-barrel fermentors.

via Facebook | Terrapin Beer Co..

 

Breweries:

email newsletter signup box anonymous tip form

One thought on “Rolec making progress on Terrapin’s 100-barrel brewhouse

  1. Thanks for posting the update. We just got the pictures of the new brewhouse (still being built in Germany) from Rolec and we are excited. We hope to have it installed and operational by year end.

    Currently installed and full of beer are 8 x 200bbl fermentors and 2 x 200bbl brite tanks produced by Sprinkman Tanks in Wisconsin. We learned about Sprinkman from the guys at Founders. Here is a link to pics of the first of these tanks coming in.

    http://www.flickr.com/photos/terrapinbeerco/sets/72157629483016838/

    Cheers,
    John

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.